Alresford - the signal-box |
Alresford - inside the signal-box |
Alresford - the signal-box diagram |
Alresford - the lever-frame in the signal-box |
Alresford - inside the bottom of the signal-box showing the interlocking on the lever-frame |
Alresford - a driver's view of the Down Inner Home when approaching from Ropley |
Alresford - the Up Starting signal for Platform 2 |
Alresford - a bracket signal on the footbridge at the end of Platform 2, with a fixed stop arm and subsidiary disc for shunting ahead into the sidings at the Winchester end of the station |
Alton - the new MHR signal-box |
Alton - the signal panel under construction inside the new MHR signal-box |
Alton - the signal panel under construction inside the new MHR signal-box |
Alton - the new Shunter's Panel and release instrument on the MHR platform |
Alton - a close-up of the new Shunter's Panel on the MHR platform |
Alton - the MHR ground-frame controlling access to the Network Rail lines |
Alton - the MHR ground-frame controlling the run-round by the MHR platform |
Butts Junction - the remains of the signal-box |
Medstead & Four Marks - the signal-box (ex Wilton South) |
Medstead - inside the signal-box |
Medstead - the signal-box diagram |
Medstead - inside the signal-box locking room, showing the lower part of the lever-frame with its interlocking |
Medstead - the Up Distant signal |
Medstead - the Up Home signal |
Medstead - the Up Starting signal with subsidiary Shunt-Ahead arm |
Medstead - a driver's view approaching the Down Home signal |
| | | |